Getting Started; Checking Contents Of Packing; Mounting Of Motor - Struers Transpol-2 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Checking Contents of Packing

Mounting of Motor

2
Transpol-2
Instruction Manual

1. Getting Started

In the packing case you should find the following parts:
1
Transpol-2
1
Carrying case with shoulder strap
1
Mains cable
1
DC motor
1
Reduction gear
1
Straight handle with holder for flapper wheel
1
Flapper wheel, grit 80
1
Right angle handle with quick coupling for rubber discs
4
Rubber discs
1
Felt cone
1
Square box for storing polishing cloths and felt cone in use
3
Spanners for tightening grinding tool
1
Spanner
1
Lock pin for use when clamping flapper wheel
1
Pair of safety goggles
2
Fuses
1
Set of Instruction Manuals
Place the plug of the motor cable in the socket on the front plate
and tighten the nut.
Screw motor and reduction gear carefully together.
If the parts cannot be screwed correctly together it is because the
driver of the motor is not correctly positioned. By turning the motor
shaft the parts can be made to line up and then be tightened up with
the spanner.
Never use force!
The reduction gear must remain mounted on the motor,
whether the straight handle or the right angle handle is to be used.
IMPORTANT

Publicité

Table des Matières
loading

Table des Matières