Placing Bottles In The Dosing Unit; Mounting An Additional Dosing Unit (Accessory) - Struers AbraPol-10 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Placing Bottles in the
Dosing Unit
Mounting an Additional Dosing
Unit (accessory)
ABTDO
plug
8
AbraPol-10
Instruction Manual
Place the filled bottles in the dosing unit and connect the
tubing.
Enter the bottle details in the Bottle Configuration menu to
make them available for preparation methods. See "Setup
Bottle Configuration".
The tubes can easily go through the bottle unit to reach larger
containers placed on the floor e.g. Lubricants.
OP-X can not be placed on the floor.
Disconnect main power.
Open the doors to the bottle unit.
Remove the rectangular cover plate
key supplied.
Remove the cover plate located on the left side of the machine
with the supplied 4 mm Allen key supplied, and loosen the
plug.
Lead the reinforced water hose from the hole on the left,
through the hole in the reinforcement beam on the inside of
the bottle unit, and through the rectangular hole in the dosing
unit.
Connect the hose to the additional dosing unit, and tighten
the clamp.
Place the ½" - ¾" fitting in the hole ( ¾" on outside) and
tighten the ½" nut.
Connect the reinforced hose to the ½" thread.
Nb!
with the 4 mm Allen

Publicité

Table des Matières
loading

Table des Matières