Nailing Tab Installation - Napoleon Luxuria Serie Manuel D'installation

Masquer les pouces Voir aussi pour Luxuria Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

nailing tab installation

10.0 nailing tab installation
EN
important:
If the front frame was removed, it must be reinstalled prior to installing the nailing
tabs.
1
REMOVE THE SCREWS FROM THE APPLIANCE.
3
# 1 (x2)
SECURE WITH SCREW SUPPLIED IN THE MANUAL BAGGIE TO
THE UPPER FRONT FRAME
TO INSTALL NAILING TABS FOR SEE-THRU APPLIANCES, REPEAT STEPS WITH THE OPPOSITE SIDE.
note:
See "venting", "electrical information" and "gas installation" sections prior to fi nish framing.
54
W415-2035 / C / 04.30.21
DO NOT DISCARD.
2
ALIGN THE NAILING TAB WITH THE HOLES ON THE APPLIANCE,
SECURE WITH THE SCREWS FROM STEP 1.

Publicité

Chapitres

Table des Matières
loading

Table des Matières