Before framing your appliance, determine vent requirements before deciding the fi nal location of the appliance.
After rough framing, place the appliance in its fi nal position.
single-sided
L
J
Ref
LVX38-1
E*
F
53 13/16" (136.7cm)
J
L
see-thru
Ref
LVX38-1
E*
F
53 13/16" (136.7cm)
J
L
rough framing - before appliance installation
E
F
LVX50-1
65 13/16" (167.2cm)
Optional - Appliance does not need to be elevated above fl oor
73" (185.4cm)
Before framing the appliance, ensure to install
the fi restop fi rst as it will not fi t between the
studs if installed after framing.
L
E
F
J
LVX50-1
65 13/16" (167.2cm)
Optional - Appliance does not need to be elevated above fl oor
73" (185.4cm)
Before framing the appliance, ensure to install
the fi restop fi rst.
note:
The LVX series requires a
minimum enclosure height, as
illustrated (dimension L), mea-
sured from the bottom of the
appliance. For temperature
requirements, this area must be
left unobstructed. Some venting
confi gurations that require more
vertical rise will require a larger
enclosure to provide minimum
vertical clearance between vent
pipes and combustibles.
LVX62-1
18" (45.7cm)
77 13/16" (197.6cm)
note:
The LVX series requires a minimum enclosure
height, as illustrated (dimension L), measured
from the bottom of the appliance. For tem-
perature requirements, this area must be left
unobstructed. Some venting confi gurations that
require more vertical rise will require a larger en-
closure to provide minimum vertical clearance
between vent pipes and combustibles.
LVX62-1
16 3/16" (41.1cm)
77 13/16" (197.6cm)
LVX74-1
89 13/16" (228.1cm)
91" (231.1cm)
*Maximum of 21" (53.5cm)
LVX74-1
89 13/16" (228.1cm)
91" (231.1cm)
*Maximum of 21" (53.5cm)
W415-2035 / C / 04.30.21
EN
37