Drainage
The cooling water drainage system must be designed to withstand a temperature of 130°C. It may be
made from copper or PVC-C or any other material that is suitable for this use.
It must be equipped with a siphon as shown above.
Initial commissioning
Switching on
Prior to switching the device on, you must ensure that the mains voltage between phases and phase and
neutral complies with the voltages set out in the paragraph entitled "Electricity network"
Filling the double jacket
Before running the first preparation cycle, it is essential to fill the double jacket of water. This has to be
done by starting successively 4 cycles that have to be stopped after the 30 seconds using the menu "WATER"
in which the water circulation can be activated. It can be switched off as soon as the water is coming out
from the drain pipe.
>40 cm
70