RECEIVER INSTALLATION
21. Secure the receiver in the fuselage. Remove the covering from the
side of the fuselage and install the switch for the radio system.
Connect the leads for the servos in their respective locations.
Connect 36-inch (920mm) extensions for the ailerons and route the
leads toward the area of the cabane struts.
22. Secure the receiver (and ignition) batteries in the fuselage using
hook and loop tape. Make sure the batteries cannot move in the
fuselage. Connect and secure the leads from the batteries to their
respective components.
23. Locate the remote receivers based on the instructions included with
the receiver or radio system.
Fokker D.VII 30–60cc ARF
Gas Engine Only
24. Install the switch for the ignition module. Connect the leads from the
switch to the ignition module and ignition battery.
33
EN