Aventics CL03 Notice D'instruction page 78

Masquer les pouces Voir aussi pour CL03:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 105
76
AVENTICS | CL03, CL03-XL | R402000141–BAL–001–AF
Assembly
Danger due to high total current!
The valve system is supplied with 24 V DC supply voltage
with electrical isolation via a power pack according
to DIN EN 60742, classification VDE 0551.
When wiring, ensure that at least 2 GND pins are
connected to ensure that the total current from all valve
solenoids can be absorbed (20 mA per solenoid). All GND
pins in the multipole plug are bridged. This must
be observed in particular with a CL03-XL subbase
for parallel actuation of valves.
Protect the solenoid control with an external fuse.
Do not exceed the permissible current load of 1 A
per connector pin.
C
B
A
Fig. 8:
Connector pin assignment for up to 16 valves/32 solenoids
CAUTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cl03-xl

Table des Matières