Operating Instructions; Dismounting - SKF EAZ Mode D'emploi

Masquer les pouces Voir aussi pour EAZ:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 49

6. Operating instructions

Before proceeding with mounting or dismount rings,
please take the following into consideration:
Cracked rings must not be heated with the
electrical induction heater.
The tool must not be switched on without the
steel ring in the bore! Otherwise the current
consumption increases considerably, and the
coil is heated too rapidly.
Additional safety is provided by an automatic
cutoff interrupting the current as soon as
the temperature of the induction coil winding
exceeds 120 °C (248 °F). This situation may
also occur after several operations in a row. In
this case, it is recommended to cool down the
device with compressed air or a fan. To prevent
this from happening, remove the hot rings as
quick as possible from the inside of the heater.
This will signiicantly increase the duty cycle of
the heater.
During dismounting, the roll neck must be
connected to earth, for example by means of a
single core cable with magnetic clamp or via de
support.
Do not leave the heater unattended, especially
in Time Mode. The temperature needs to be
monitored to avoid damages.
Fig.10 – The heater is being positioned over the ring
12 EN

6.1 Dismounting

A. Place the electrical induction heater over the
ring to be withdrawn. The transportation can
be done just by crane or hoist and with hemp
ropes. Do not use steel ropes!
Fig.9 – Do not use steel rope to lift the heater
B. Connect the roll neck to earth with the magnetic
grounding cable supplied or by other authorized
means.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Eaz ccSkf eaz

Table des Matières