Electrical Installation - Lowara ResiBoost MMW Manuel D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 46
en - Original instructions
Number
Component
15
Power panel
with high sensi-
tivity differential
switch (30 mA).
See
Electrical
requirements
page 28.
16
Storage tank
17
Float switch
18
Filter for motor
cable over 30 m
in length.
4.3.3 Components for correct installations
with submerged electric pumps
See
Figure 26
on page 286,
Figure 28
on page 288, and
Number
Component
1
Electric pump
2
Cable clamp
3
Motor power ca-
ble
4
Level probes to
prevent dry run-
ning (or other
level control
sensor)
5
Mounting brack-
et
6
Non-return
valve
7
Pressure gauge
8
Pressure trans-
ducer
9
Gate valve
10
Diaphragm
tank, minimum
8 liters
11
QCL5 control
board for level
probes
12
Filter for motor
cable over 30 m
in length.
13
Converter
14
Converter pow-
er panel
15
Delivery pipe
16
Electric pump
bleed / priming
cap
30
Included in the
kit
on
Figure 27
on page 287,
Figure 29
on page 289.
Included in the
kit
Number
Component
17
PTC or PT1000
(available only
with some mod-
els of the sub-
merged motor)
18
Power panel
with high sensi-
tivity differential
switch (30 mA).
See
Electrical
requirements
page 28.
19
Quick coupling
(provided for
fastening the
converter on the
pump)
The following notes and recommendations refer to
Figure 26
on page 286,
Figure 27
ure 28
on page 288, and
A. Distance between the clamps that secure the
drop cable to the delivery pipe.
B. Distance from the bottom of the well to the elec-
tric pump.
Recommendations:
• Non-return valve at 10 m distance from the deliv-
ery flange, plus an additional non-return valve
every 30-50 m of piping.
• Secure the drop cable to the pipe every 2 to 3
metres of piping.
• Make sure the electric pump is installed at a safe
distance from the bottom of the well.
• Make sure there is a minimum distance of 3 mm
between the diameter of the pump and the inter-
nal diameter of the well.
• During operation, make sure that the water circu-
lation speed around the motor is at least 8 cm/
sec.
• Make sure that the minimum dynamic level of the
water in the well is at least 1 m above the pump's
delivery flange.

4.4 Electrical installation

Precautions
WARNING:
• Make sure that all connections are
performed by qualified installation
technicians and in compliance with
the regulations in force.
• Before starting work on the unit,
make sure that the unit and the con-
trol panel are isolated from the power
supply and cannot be energized.
NOTICE:
According to the installation, for the Resiboost with
A1 class (EMC), the installer will have to assess
whether additional measures are necessary to miti-
gate possible radio interference.
Grounding (earthing)
Included in the
kit
on
on page 287,
Fig-
Figure 29
on page 289.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Resiboost mtwResiboost mmaResiboost mta

Table des Matières