Commissioning; Maintenance - Biral Birox 80 Notice De Montage Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5. Commissioning

The pump may be operated only via a fault current protection switch (max. rated
release current strength of the fault current protection switch 30 mA SEV Regula-
tion, NIN (CENELEC)
The level switch mounted on the pump allows the pump to be switched on and off automatical-
ly depending on the water level.
The level switch must be capable of moving freely.
After immersion in the medium to be delivered and connection to a socket, the pump is imme-
diately ready for operation
Long periods of dry running or operation with insuffi cient medium are not permis-
sible
Always switch off the mains voltage before working on the pump
(disconnect the plug).

6. Maintenance

The pump is maintenance-free.
– During mobile use, clean the pump by delivering fresh water each time after use, in order to
avoid dirt deposits and crusts.
– During stationary use, check the functioning of the level switch from time to time.
english
|
35

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Birox 90Birox 100Birox 150Birox 200

Table des Matières