Installing The Connection Between Top And Base Units; Opening The Cooking Station; Opening The Operating Panel; Removing The Side Panel - Salvis VisionPro Série Notice De Montage

Masquer les pouces Voir aussi pour VisionPro Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.

Installing the connection between top and base units

This work is only necessary if the top and base units were separated.
4.1

Opening the cooking station

4.1.1

Opening the operating panel

Screw M4x10, hexagon socket
WAF 2.5 mm, art. no. 02221807
Screw M6x35, hexagon socket
WAF 4 mm, art. no. 782629
4.1.2

Removing the side panel

Screw M5x10,
cross-head, art.
no. 014154
Do not release/
removethe bottom
Assambly instruction Cooking station
Installing the connection between top and base units
screws!
Opening
. Remove the gas knob (not the electric
knob).
. Remove the gas tap lever, water supply
lever.
. Remove M4 and M6 screws.
. Lift up the operating panel and pull for­
wards.
. Fold down the operating panel.
Closing
. Install the side section (chapter 4.1.2).
. Fold up the operating panel.
. Slide in the operating panel.
. Insert all screws, then tighten them.
. Install the gas knob.
. Install the gas tap and water supply lever.
D The side panel attaches at the bottom.
D Do not release/ remove the screws at the
bottom, otherwise the support plate co­
mes off.
. Open the operating panel, see page 39
chapter 4.1.1
. Remove the four screws at the side.
. Swivel out the side panel at the top, lift it
up and remove it.
39 / 72

Publicité

Table des Matières
loading

Table des Matières