Tasks For Separate Delivery Of Top And Base Units - Salvis VisionPro Série Notice De Montage

Masquer les pouces Voir aussi pour VisionPro Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2.8

Tasks for separate delivery of top and base units

. Disconnect/remove supply and drain lines and attach to the top section so they cannot be
crushed or damaged during transport and assembly.
. Remove the side panels.
Transporting the top section – horizontally
. Close the operating panel and tighten with the screws.
Transporting the top section – upright, sideways
34 / 72
Specifications for assembly at the factory
Remove the
operating panel on the setup side
The setup side must be marked on the
design plan!
. Remove the knobs on the setup side of the
top section and uninstall the controls/swit­
ches.
D Do not remove the operating elements
with cables for induction.
. Remove the operating panel on the setup
side of the top section.
Assambly instruction Cooking station

Publicité

Table des Matières
loading

Table des Matières