Sensor connection
Surface
induction
Wok
Coil
connection
Operating
element
Indicator
light
Po
tentiometer
Group 2
4.4
Check: Are all supply/drain lines connected completely?
Equipotential bonding
Electrical connections
Water supply
Water drain
Are all supply and drain lines positioned with sufficient spacing to heat sources and secured
with cable ties?
Gas connections (gas leak test see page 24 chapter 5.1)
44 / 72
Installing the connection between top and base units
Connection side of induction generator
Markings on the induction generator
- Sensor connection: Size 2 B +9F
- Coil connection: Size 2 B
- Operating element: Size 2 Control B
-> For more information see individual cir
cuit/wiring diagram.
Assambly instruction Cooking station