Checking the cooking station after connecting

Tightness of water supply
Tightness of water drain and swift draining
Electric test
− according to the applicable VDE 0701 - 702 and 0105 regulations
− and the regulations of the responsible energy supplier.
Gas leak test on gas connections
Gas leak test
D If the cooking station was delivered in sections for transport and assembled at the in­
stallation site, a gas leak test has to be carried out.
D A gas leak test on the gas installation modules is not necessary if the cooking station is
delivered and installed in one piece.
D The gas leak test may only be conducted by authorised customer service personnel or by an
appointed gas engineer.
D The test has to be documented on the "Gas leak test report" (form art. no. 887299).
D The completed test report has to be sent to the factory.