Beretta Mynute Boiler Green E 25 B.S.I. Manuel D'installation Et D'utilisation page 5

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23
EN
INSTALLER
1 - GENERAL SAFETY DEVICES
Our boilers are built in our plants and checked down to the
smallest detail in order to protect users and fi tters from injury.
After working on the product, qualifi ed personnel must check
the electrical wiring, in particular the stripped part of conduc-
tors, which must not stick out from the terminal board, avoid-
ing possible contact with live parts of such conductor.
This instruction manual is integral parts of the product: make
sure that it remains with the appliance, even if it is transferred
to another owner or user, or moved to another heating sys-
tem. In case of loss or damage, please contact your local
Technical Assistance Service for a new copy.
Boiler installation and any other assistance and maintenance
operation must be carried out by qualifi ed personnel accord-
ing to current local and national regulations.
The installer must instruct the user about the operation of the
appliance and about essential safety regulations.
This boiler may only be used for what it was expressly built to
do. The manufacturer declines all contractual and non-con-
tractual liability for injury to persons or animals or damage to
property deriving from errors made during installation, adjust-
ment and servicing and from improper use.
This appliance is used to produce hot water and must there-
fore be connected to a heating and/or a domestic hot water
system, according to its performance and power
After removing the packaging, make sure the contents are
undamaged and complete. If this is not the case, contact your
dealer.
When the product reaches the end of its life it should not be
disposed of as solid urban waste but should be brought to a
separated waste collection facility.
The safety and automatic adjustment devices on the appli-
ance must never be modifi ed during its lifetime, except by the
maker or dealer.
If the appliance develops a fault and/or works badly, switch it
off and do not attempt to repair it yourself.
The safety valve outlet must be connected to a suitable col-
lection and venting system. The manufacturer declines all li-
ability for any damage caused due to any intervention carried
out in the safety valve.
Dispose of all the packaging materials in the suitable contain-
ers at the corresponding collection centres.
Dispose of waste being careful not harm human health and
without employing procedures or methods which may dam-
age the environment.
Connect the outlet collector to a suitable outlet system (refer
to chapter 5).
During installation, inform the user that:
• in the event of leaks, he/she must shut off the water supply and
promptly inform the Technical Assistance Service
• the operating pressure of the system ranges between 1 and 2
bar and must never be greater than 3 bar. If necessary, reset
the pressure as indicated in the paragraph entitled "Filling the
system"
• if the boiler is not planned to be used for a long period, he/she
should call in the Technical Assistance Service to perform the
following operations:
The following symbols are used in this manual:
CAUTION= operations requiring special care and adequate prepara-
tion
NOT ALLOWED= operations that MUST NOT de performed
R.S.I - DHW functions refer only if a water thank is connected (accessory
available on request).
- turn off the main boiler and general system switches
- close the gas and water taps on both the heating and domes-
tic hot water circuits
- drain the heating and domestic hot water circuits to prevent
freezing.
Safety measures:
The boiler should not be used by children or unassisted dis-
abled people
Electrical devices or equipment, such as switches, applianc-
es, etc., should not be used if there is a smell of gas or fumes.
If there is a gas leak, open all the doors and windows to ven-
tilate the area, turn off the general gas tap and immediately
call the Technical Assistance Service.
Do not touch the boiler barefoot or if parts of your body are
wet or damp.
Before cleaning operations, disconnect the boiler from the
main power supply by turning "OFF" the two position system
switch and the main control panel switch
It is forbidden to modify the safety or adjustment devices
without the manufacturer's permission and relative instruc-
tions.
Do not pull, detach or twist the wires from the boiler even if
they are not connected to the power supply.
Do not block or reduce the size of the ventilation openings in
the room.
Do not leave infl ammable containers or substances in the
room.
Keep packaging out of reach of children.
It is forbidden to block the condensate outlet.
2 - BOILER INSTALLATION
Boiler must only be installed by qualifi ed personnel in compliance
with current legislation.
Mynute Boiler Green E B.S.I. is a C-type condensation wall-
mounted boiler for heating and producing domestic hot water, sup-
plied with a 45 litres inox water tank (25 B.S:I.) - 60 litres (32 B.S.I.).
According to the fl ue gas outlet device, the boilers are classifi ed in
categories B23P, B53P, C13, C23, C33, C43, C53, C63, C83, C93,
C13x, C33x, C43x, C53x, C63x, C83x, C93x.
In confi guration B23P and B53P (when installed indoors), the ap-
pliance cannot be installed in bedrooms, bathrooms, showers or
where there are open fi replaces without a proper air fl ow. The room
where the boiler is installed must have proper ventilation.
In confi guration C, the appliance can be installed in any type of
room and there are no limitations due to ventilation conditions or
room volume.
3 - INSTALLATION REGULATIONS
3.1 Installation regulations
Installation must be carried out by qualifi ed personnel.
Always comply with national and local regulations.
Mynute Boiler Green E can be installed indoors.
The boiler has protection that guarantees correct operation with a
temperature range from 0°C to 60°C.
To take advantage of protections, the appliance must be able to
start up, since any lockout condition (for example, absence of gas
or electrical supply, or safety intervention) deactivates the protec-
tions.
MINIMUM DISTANCES
In order to have access to the boiler to perform regular mainte-
nance operations, respect the minimum spaces foreseen for instal-
lation (fi g. 2).
Mynute Boiler Green E B.S.I.
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mynute boiler green e 32 b.s.i.2009618920096190

Table des Matières