Beretta Mynute Boiler Green E 25 B.S.I. Manuel D'installation Et D'utilisation page 11

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23
cally shows the number of rotations, expressed in hundreds
(e.g. 25 = 2,500 rpm).
The function for visualizing the setting parameters is activated by
the function selector in summer and in winter, by pressing the CO
button on the circuit board, either with or without request for heat.
This function cannot be activated when connected to a remote con-
trol.
Upon activating the function the setting parameters are visualized
in the order given below, each for 2 seconds. Each parameter is
displayed together with its corresponding icon and fan rotation
speed measured in hundreds
1. Maximum
2. Minimum
3. Max. heating
P
4. Slow ignition
5. Max. preset heating
GAS VALVE CALIBRATION
- Connect the boiler to the power supply
- Open the gas tap
- Set the function selector to
- Loosen the screws (A), remove the housing, then lower the in-
strument panel towards you (fi g. 6-7)
- unscrew the two screws of the small cover on the electronic
board to have access to the terminals
- while the boiler is powered up, using a small screwdriver includ-
ed, press the CO button (fi g. 9).
Live electrical parts (230 Vac).
- Wait for burner ignition.
The boiler operates at maximum heat output.
The "combustion analysis" function remains active for a limited
time (15 min); if a delivery temperature of 90°C is reached, the
burner is switched off. It will be switched back on when this tem-
perature drops below 78°C.
- Insert the analyser probe in the ports provided in the air distribu-
tion box, after removing the screws from the cover (fi g. 19)
- Press the "combustion analysis" button a second time to reach
the number of rotations corresponding to the maximum domestic
hot water output (table 1)
- Check the CO2 value: (table 3) if the value does not match the
value given in the table, use the gas valve maximum adjustment
screw
- Press the "combustion analysis" button a third time to reach the
number of rotations corresponding to the minimum output (table
2)
- Check the CO2 value: (table 4) if the value does not match the
value given in the table, use the gas valve minimum adjustment
screw
- To exit the "combustion analysis" function, turn the control knob
- Remove the fl ue gas probe and refi t the plug
- Close the instrument panel and refi t the housing.
The "combustion analysis" function is automatically deactivated if
the board triggers an alarm. In the event of a fault during the com-
bustion analysis cycle, carry out the reset procedure.
(OFF/RESET) (monitor off)
table 1
MAXIMUM NUMBER OF FAN
ROTATIONS
25 B.S.I. heating - DHW
32 B.S.I. heating - DHW
table 2
MINIMUM NUMBER OF FAN
ROTATIONS
25 B.S.I.
32 B.S.I.
table 3
MAXIMUM CO
2
25 B.S.I.
32 B.S.I.
table 4
MINIMUM CO
2
25 B.S.I.
32 B.S.I.
table 5
SLOW IGNITION
25 B.S.I.
32 B.S.I.
Mynute Boiler Green E B.S.I.
METHANE
LIQUID
GAS (G20)
GAS (G31)
5.600
5.600
5.200-6.300
5.200-6.300
METHANE
LIQUID
GAS (G20)
GAS (G31)
1.700
1.700
1.600
1.600
METHANE
LIQUID
GAS (G20)
GAS (G31)
9,0
10,0
9,0
10,0
METHANE
LIQUID
GAS (G20)
GAS (G31)
9,5
10,0
9,5
10,0
METHANE
LIQUID
GAS (G20)
GAS (G31)
3.400
3.400
3.400
3.400
rpm
rpm
rpm
rpm
%
%
%
%
rpm
rpm
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mynute boiler green e 32 b.s.i.2009618920096190

Table des Matières