GB
Fig. 4
Fig. 5/AC
Fig. 6/AC
Fig. 6/B
ZKN1 - ZKN2
Fig. 7/AC
Fig. 5A/B
Fig. 5B/B
Fig. 7/B
Fig. 4
Insert the connector joining (2) the two tracks (1). Bring the tracks together
until they stop and lock.
Fig. 5/AC-6/AC-7/AC
On the installation - variation A/C, insert the fixing bracket (a) in the chain
and turn it 90° (b). Insert the terminal head (5) in the guide (c) , and the
washer (4) with spring (3) in the draught dowel (2). Screw the dowel in the
fixing bracket (1). Tighten the chain until the mark (arrow).
Attention! Do not tighten the chain from the power supply side, because it
is already pre-tightened in the lab.
Fig. 5A/B-5B/B-6/B-7/B
On the installation - variation B, invert the supply voltage head. Insert the
fixing bracket (a) in the chain and turn it 90° (b).
Insert the terminal head (6) in the guide (c) and the washer (5) with spring
(4) in the draught dowel (3). Screw the dowel in the fixing bracket (1).
Tighten the chain until the mark (arrow).
Attention! Do not tighten the chain from the power supply side, because it
is already pre-tightened in the lab.
24/56