arjo Enterprise 9600X Notice D'utilisation page 61

Masquer les pouces Voir aussi pour Enterprise 9600X:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Check the condition of the backup battery by carrying out the
Battery test
following test.
1. Disconnect the bed from the electricity supply.
2. Raise the mattress platform to maximum height - ignore
3. Raise the backrest and thigh sections as far as they will
4. Press and hold the CPR button. The mattress platform will
5. Lower the mattress platform to minimum height.
6. Apply maximum head down tilt (Trendelenburg).
7. Return the mattress platform to the level position; then
If this test is not completed successfully, connect the bed to the
electricity supply for at least eight hours to recharge the battery
then perform the test again. If the bed fails a second time,
contact Arjo or an approved service agent.
To maintain best performance, the backup battery should be
replaced every four years by an approved service agent.
the battery warning tone.
go.
flatten and lower to a mid-height position.
apply maximum foot down tilt (reverse Trendelenburg).
61

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Enterprise 9700xEnterprise 9800x

Table des Matières