BPW iMC Instructions De Montage Et Mode D'emploi page 21

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Motor L/R
6/10 mm²
(depending
on model)
Motor drive
1,5 mm²
Connection of base station
Connect the cables to the base station according to the
connection diagram and the coloured markings.
Use the supplied cable ties and cable lugs [14] for routing
and attaching the cables. As protection against sharp edges,
use suitable electrical installation tubes that are available
from retailers.
} Caution:
Always connect the cables to the base station with the
correct phase, according to their colour!
Now route the battery connection cables (red and black)
from the base control unit [03] to the caravan battery. The
integrated master switch should be installed in an easily
accessible location. Here too, use electrical installation
tubes as protection against sharp edges.
The distance between the battery and base control unit [03]
should never be longer than the length of the cables
provided.
Installation of the electrical system
Route surplus cables in bays,
not in loops!
The strip fuse installed in the positive (+) cable (single-axle:
150 A / Tandem T2 and T4: 175 A) must be located in front of
the master switch in the direction of the battery.
} Caution:
If the fuse has blown, it is only allowed to be replaced by
a fuse of the same design.
– Single-axle: 150 A
– Tandem: 175 A
Finally, connect the 16 mm² battery connection cables (red
and black) to the battery.
In Tandem trailers with four-wheel drive, connect the two
base control units [03] together using the front-rear cable
[13] provided.
This completes the electrical installation.
21

Publicité

Table des Matières
loading

Table des Matières