5 - the power supply cable is guided through the cable
relief, and the relief ring installed as shown.
6 - make sure the cable is seated as shown.
7 - the terminal nuts and washers are removed, and all
cables attached as indicated. Washers and nuts are
re-installed and fastened securely. The ground wire is
connected as shown.
1
10
2
3
8 - the final connection should now look like this (de-
pending on the motor brand). Tighten the cable relief
and re-install the connection box lid.
9 - tighten the cable relief for power supply and ther-
mistor cables.
10 - install the potential equalizing cable, and tighten
the nut securely (the right terminal is for grounding to
the plant).
Reinstall the upper panel with the 4 screws. It can be
necessary to press the side panels slightly, to align the
screw holes.
Reconnect the drain hoses and refit the blower covers.
11 - power supply cable to the control box is guided
through the relief union as indicated.
12 - power supply cable is connected to the main
switch as indicated. Finally the potential equalizing
cable and thermistor cable are connected.