EN
2.1.2.2 Electrical installation - NTP PoE model
x
The paragraph numbers
indicated below refer to the figures above for model NTP 230V.
- With lighting option: pass the mains cable through the left-hand cable gland then connect this
cable to the terminal block
in the terminals L-N-
dedicated to the lighting
,
1
- Attach this cable to the fixing plate with a cable retainer
,
- Pass the Ethernet cable through the smallest central cable gland,
- Then crimp the RJ45 male connector on the cable, but only once it has been passed through into
the clock and check crimping of the cable using a network tester,
- Then connect this cable to the circuit board via the Ethernet port
,
2
3
- Connect the back-up battery cable (if there is one) to the circuit board
,
- Clean the seal and then apply silicone oil on it,
- Move the clock face closer and then reconnect the flat cable
4
that goes from the circuit
board to the movement
located on the clock face,
5
- Limit the length of the cable by passing it through the cable clip
in order to avoid shading in
6
the case of the lighting option (contact of the cable with the dial once the clock is closed),
PoE version circuit board with power supply module behind the Ethernet port
- Close the clock again by putting the clock face back in its original position,
- Tighten the four cover screws (1,2 Nm),
- Replace and tighten the air inlet screw (15 Nm) located on the underside of the clock.
34