Sampling time for rising
19 Time er04
temperature change verification, set in parameter
20
Temperature differential to be checked in
Temperature
the time set in parameter 19.
20
er04
If "0", error checking "er04" is OFF
Sampling time for negative temperature
21 Time av01
change verification, set in parameter 22
Temperature
Negative temperature differential to be
22
av01
checked in the time set in parameter 21
Sampling time for verification of positive
23 Time av02
temperature change, set in parameter 24
Temperature
Positive temperature differential to be
24
av02
checked in the time set in parameter 23
Input status sampling time 2 :
25 Time av03
fryer basket raised
The data plate is on the front side, (see diagram in electric connection item) and has all the data necessary for the
connection.
When fitting, the appliance must be levelled using a spirit level slight differences of level can be adjusted by screwing or
unscrewing the adjustable feet. The main switch or the socket must be near the appliance and easily accessible.
It is advisable to place the appliance under an extractor hood so that steam is extracted rapidly. If the appliance is placed
near walls, dividing panels, kitchen furniture, decorative finishing, etc. , these should be in flameproof material; otherwise
it is necessary to cover them with non-flammable material.
Above all, it is necessary to ensure that the fire prevention norms are observed.
The installation, starting up and maintenance of the appliance must be carried out by qualified personnel. All operations
done when installing must be carried out observing the norms in force.
The manufacturer declines all responsibility in the event of incorrect functioning due to wrong installation or installation
which does not comply with the norms.
Attention! In accordance with international rules, when connecting the appliance, an automatic device enabling the
disconnection of all contacts from the mains, must be installed above it; this device must have a contacts opening of at
least 3 mm.
Installation must be carried out observing the following norms:
- Safety prescription in force
- Installation prescription in force
The appliance is supplied without the connection cable. To install the power supply cable, proceed as follows:
Disconnect the power supply.
Remove the bottom panel
Push the connection cable through the cable blocker, connect the conductor wires to the corresponding terminals in
the junction box and fix them into place.
Block the cable with the cable blocker, and reassemble the bottom panel. The earth wire must be longer than the
others so that if the cable blocker should break, it will disconnect after the tension wires.
The connection cable must have an adequate section for the power of the appliance and be resistant to a temperature of at
least 150°C (see technical data table).
GB
IT
INSTRUCTIONS FOR INSTALLATION
INSTALLATION
LAWS, TECHNICAL RULES AND NORMS
ELECTRIC CONNECTION
IE
CH
1-500
0-20
0-10
1-60
1-10
1-60
0-60
24
120
sec.
1
°C
1
2
sec.
1
2
°C
1
40
sec.
1
5
°C
1
5
sec.
1