Télécharger Imprimer la page

Emerson AVENTICS XVES Notice D'instruction page 15

Pilotage io-link

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Ambient conditions
• Protect the product from direct sunlight and UV radiation.
6.1.2 Required accessories, materials and tools
Select material and tools that are suitable for your product configuration. De-
pending on the configuration, you will need further accessories.
Mounting material
Tools
• 1x Torx 10 screwdriver
6.2 Preparation
6.2.1 Unpacking and checking the product
1. Check the material number to see if the product matches your order.
2. Check the product for transport and storage damage.
Do not install a damaged product. Return damaged products together with
the delivery documents. See
3. Prepare required accessories, materials and tools.
6.2.2 Implementing safety measures
Procedure
1. Do not carry out any work on the system during preparation.
2. Close off dangerous areas.
3. Make sure the system or system part is not under pressure or voltage.
4. Protect the system against being restarted.
5. Allow product and adjacent system parts to cool down.
6. Wear PPE.
6.2.3 Software installation
1. Call up the product page in the Emerson Store: http://www.emerson.com/
xv03c | http://www.emerson.com/xv05c
There is a QR code on the product that also leads to the software and user docu-
mentation.
2. Download zip archive with device description files.
Table 2: IODD file versions
IO-Link
Type A
Type AB
Type B
3. Install files.
6.3 Installation
The product is preassembled.
6.4 Connecting the electrical system
• Observe the pin assignment. See
• Observe technical data on the cable cross-section. See
• Use shielded cables to protect against interference and electrostatic effects.
• Use cable in accordance with the IO-Link standard.
AVENTICS™ XVES | 570096-BAL-001-AA | English
g 4.3 Returning the
product.
6 bytes (COM3)
AVENTICS- XVES-E-BC-IO-Link-A-48-YYYYM-
MDD-IODD1.1
AVENTICS- XVES-E-BC-IO-Link-AB-48-YYYYM-
MDD-IODD1.1
AVENTICS- XVES-E-BC-IO-Link-B-48-YYYYM-
MDD-IODD1.1
g 11.4 Pin
assignment.
g 14 Technical
Procedure
1
Fig. 2: Position of grounding screw
1 Grounding screw
1. Release the grounding screw.
2. Mount the grounding cable using the grounding screw. Screw in grounding
screw.
The grounding screw is located on the base plate of the valve system.
1. Connect voltage to the plug connector.
Tightening torque: 1.5 Nm ±0.5 Nm
2. Ground the product in accordance with EN 50178 and IEC 60364.
7 Commissioning
7.1 Step-by-step commissioning
• Step 1:
g 7.1.1 Switching on the product
• Step 2:
g 7.1.2 Carrying out a self-test
• Step 3:
g 7.1.3 Setting the timeout
• Step 4:
g 7.1.4 Configuring the product
• Step 5:
g 7.1.5 Defining bits
7.1.1 Switching on the product
Switch on the power supply.
u
ð The UL/UA and COMM LEDs illuminate green.
ð The valves are switched off.
7.1.2 Carrying out a self-test
1. Ensure that the pneumatic supply is disconnected.
2. Ensure that all valves are switched off.
3. Issue the Self test command via the IO-Link master.
4. Restart the product.
5. Check the result of the test using the valve LEDs.
6. Issue the Normal mode of operation command via the IO-Link master.
data.
7. Restart the product.
Table 3: Self test commands
ISDU/ index
0x61
7.1.3 Setting the timeout
Set the timeout on the IO-Link master.
u
Sub-index
Description
0x00
Normal operating state
0x01
Switch all outputs
0x02
Switch on all channels
0x03
Switch groups of 2 outputs
0x04
Output of Grey code to
Ch00 ... Ch24 and comple-
mentary output of Grey code
to Ch25 ... Ch48
15

Publicité

loading