Location Selection; Installation In A 400 X 400 Cut-Out; Installation In A New Cut-Out; Preparation For Mains Cable Connection - Truma Aventa comfort Mode D'emploi

Masquer les pouces Voir aussi pour Aventa comfort:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 24

Location selection

After installation of the air-conditioning system, any ex-
isting exhaust cowl nearby must extend at least 10 cm
over the air-conditioning system. The exhaust cowl must be
extended if necessary (pay attention to the heater manufactur-
er's information).
The vehicle roof (roof thicknesses from 25 to 110 mm) must
be level and smooth.
There are 3 installation options:
A new cut-out has to be made (350 x 380 mm).
Cut-out from an existing skylight (400 x 400 mm) without
sealing frame (accessories).
Cut-out from an existing skylight (400 x 400 mm) with seal-
ing frame (accessories) (Operating instructions are supplied
with the sealing frame.)
Please always take the following requirements into
account:
If at all possible, the unit should only be installed a little way
from the centre of the vehicle.
Check that installation will not be obstructed in any way.
There may be electrical cables running between the inside
and the outside of the roof. Disconnect all voltage sources
before starting work (all poles).
The maximum permitted roof load must not be exceeded
(see the vehicle manufacturer's specification).
Check the internal installation location for obstructions.
A wooden reinforcement frame must be fitted around
the cut-out in the roof between the upper and lower roof
surface (min. 25 mm). It may be necessary to remove the
insulation.

Installation in a 400 x 400 cut-out

For optimum sealing, we recommend using the sealing frame
which can be purchased as an accessory (part no. 40091-19000).
Installation with the sealing frame is described in the installa-
tion instructions supplied with it.
Installation of the unit in vehicles with an existing skylight:
The cut-out must measure 400 x 400 mm.
Remove the existing skylight (increase the size of the cut-out
if necessary).
Remove seal residue and unevenness.
Fill screw holes with body sealant.
For the remaining installation steps, please refer to "Prepara-
tion for mains cable connection".

Installation in a new cut-out

Vehicles without an existing cut-out:
required cut-out 350 x 380 mm
Place the template in the installation location on the vehicle
and mark and cut out the cut-out (350 x 380 mm).
Mark out the 4 holes (10 mm) for attaching the brackets and
drill through the roof.

Preparation for mains cable connection

A leadthrough for the mains cable to the connection point
should be provided in the intermediate ceiling, for example.
Lift the unit onto the roof, holding it in a horizontal position,
and insert it into the cut-out. The arrow points in the vehicle's
direction of travel.
If the unit has been turned over or was not horizontal at
all times, you must wait 2 hours before switching it on.
Slide the unit forward in the cut-out as far as it will go.
Remove the protective film.
21

Publicité

Table des Matières
loading

Table des Matières