6.3.1 ANTI-VIBRATION MOUNTS
1
The use of anti-vibration mounts and M8 threaded rods is suggested during installation
phase, as shown in the picture.
2
3
4
5
6
6.3.2 MOUNTING THE EBH UNIT
7
After having completed the phase «Preparation for installation», the unit has to be turned
upside down on its pallet.
8
For the ceiling mounting of the unit, use a forklift in order to assure correct and safe
positioning during the fixing operations.
Enclosure 2 shows the dimensions for the fixing and connection of the unit to the system.
9
6.4 WATER CONNECTIONS
10
For the hydraulic connection of the air-handling unit, use only suitable material and
+
follow the prescriptions of the system (project and rules of the Country of installation).
Hydraulic standard connections of the units are on the right side (as viewed from the front
when the unit has been installed). It is possible to order the unit with left water connections.
32
LEGEND
1.
Anti-vibration
2.
Threated rod
3.
Fixing support