-
Min/max water temperature: 5/75 °C;
-
Water flow: see Enclosure 3;
-
Hardness of water into the heat exchanger: It is the one indicated by the de-
signer/installer for the correct functioning of the system.
•
Technical features of the fan motor:
-
With each EBH unit there is the possibility to have 3 different air volumes (MIN-
MED-MAX speed) according to the use requirements.
-
The electric motor is provided with an internal thermal protection; it is a single-
phase motor with capacitor permanently inserted.
5. TRANSPORT AND WAREHOUSE STORAGE
All the EBH units are packed in carton boxes and put on pallets that assure an easy and safe
manoeuvrability, also granting the absence of risks due to a wrong handling.
If EBH units have to be stored in the warehouse, we recommend you to respect the
instructions indicated on the external label of the carton.
Even though the units have been properly protected to withstand adverse conditions,
we recommend that they are kept under the following ambient conditions, if stored in the
warehouse for long periods of time: min. -5 °C, max 50 °C; relative humidity: less than 80%. On
the packaging of each unit there is a label showing the main identification details of the content.
When receiving the goods, please open the shipping carton, to make sure that all
components are present and in good condition. Any damage must be immediately
communicated to the shipping agent, and our service department must be notified
immediately if any material is missing.
6. INSTALLATION
6.1 PRESCRIPTIONS FOR THE POSITIONING AND FIXING THE UNIT
Each operation for installation and/or maintenance must be executed by qualified
personnel only, by respecting the safety norms and the installation rules of the Country
where the fan coil is installed. EURAPO s.r.l. refuses every responsibility for any damages
caused by incorrect installation or improper use of the high-handling unit and its
accessories. In particular, when making connections, do not use hanging, non-standard
connections or flexible tubes with unsuitable connectors. Always use expansion bolts.
The positioning and connection of the air-handling unit must be established
from the designer of the system, who has to assure the correct running of the
unit by respecting the rules and the laws in use in the installation Country.
EN
1
2
3
4
5
6
7
8
9
10
+
29