Télécharger Imprimer la page

haacon 4336.16 Manuel D'instructions page 41

Publicité

Les langues disponibles

Les langues disponibles

6.4 installing the roller set
1. Place the wheel unit with the guard bracket on the floor. Con-
nect the wheel unit to the handlebar (1), use socket bolts (8)
and (9) for this.
2. Unlock the support rollers (7), fold down 90° and lock with
locking bolts (7.1).
3. Drive the wheel unit under the container. The holes in the
wheel unit must be directly below those on the fastening
element (2).
2
094343_m_gb_crllstz_v
9
8
fig. 6-9
7.1
7
fig. 6-10
fig. 6-11
haacon hebetechnik gmbh – Telefon +49 (0) 9375 - 84-0 . Fax +49 (0) 9375 - 8466
4. Raise the wheel unit by pushing down on the steering rod (1).
Align the holes for the first bolt.
5. Insert the bolt (3).
6. Raise the roller with the steering rod. Insert the second bolt.
7. Secure the two connectors with linchpins (3.1).
3
1
8. Remove the steering rod (1).
9. Apply the parking brakes (5) on all rollers, to prevent the
container from accidentally rolling away.
10. Engage all direction locking devices (4) (–> section 6.6 ).
4
3.1
1
fig. 6-12
fig. 6-13
5
fig. 6-14
1
7

Publicité

loading

Ce manuel est également adapté pour:

4336.24