Télécharger Imprimer la page

Faema E71 E Utilisation Et Installation page 57

Masquer les pouces Voir aussi pour E71 E:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 83
USE
10. Daily operation
"Before setting the machine to work, make sure that:
• the main electric power switch is on;
• the mains water tap has been turned on".
1
ON
3
If one of the
the temperature reached at that moment.
.
.
Boiler temperature indication.
duration.
duration.
2
4
machine is ready for use.
11 EN
CHECK BOILER
and relative
and relative

Publicité

loading