Télécharger Imprimer la page

Faema E71 E Utilisation Et Installation page 53

Masquer les pouces Voir aussi pour E71 E:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 83
5. Installation Check-up
WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY
WATER CONNECTIONS
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-levelling device is working properly.
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE
ALLOWING THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS
ACCORDING TO THE INSTRUCTIONS BELOW:
GROUPS
HOT WATER
See the "Hot water dispensing" chapter in the User's Manual.
STEAM
.
7 EN
.

Publicité

loading