Télécharger Imprimer la page

Hypertherm Powermax105 SYNC Mode D'emploi page 15

Masquer les pouces Voir aussi pour Powermax105 SYNC:

Publicité

Les langues disponibles

Les langues disponibles

1. Put the power cord in the strain relief.
CSA: From the outside of the plasma power supply, put the power wires and ground wire
through the retention nut
relief
.
2
CCC/CE: From the inside of the plasma power supply, put the wires at the line-disconnect
end of the power cord through the strain relief
supply, pull the full length of the power cord through the strain relief. Then put the wires at
the line-disconnect end of the power cord through the retention nut
CCC/CE models have ferrite cores
ground wire. To maintain CCC/CE certification, install a CCC/CE power
cord kit.
2. Attach the ground wire to the heatsink with the screw
screw to 4 N·m (35 lbf·in).
3. Put the 3 power wires
4. Push the 3 power wires into the inside edge of
the rear panel using the guide posts
sure that the routing of the wires is correct.
5. From the outside of the rear panel, tighten the
strain relief retention nut
with your hand plus a quarter turn.
Powermax105 SYNC
Field Service Bulletin
All manuals and user guides at all-guides.com
. Then put the power wires and ground wire through the strain
1
5
in the power switch. Tighten the set screws
7
. Make
9
on the strain relief
10
810420
Power Cord and Strain Relief Replacement
. From the outside of the plasma power
3
on the power wires and the
you removed previously. Tighten the
6
.
4
to 2.3 N·m (20 lbf·in).
8
9
10
15

Publicité

loading