3.6.4 - ADDR341 parameter - Smart Grid enabling connection
- Access the switchgear as described in paragraph "2.2.2 - Access to internal components".
- Connect the 2 contacts as shown:
- To open or close the contact, please refer to paragraph "6.3.2 - Smart Grid function".
The Smart Grid function has been developed in agreement with:
BWP (Bundesverband Wärmepumpe e.V.);
for further updates, please consult the website:
4 - INSTALLATION CHECKS
4.1 - PREPARATION FOR FIRST COMMISSIONING
The first commissioning of the air-water heat pump must be carried out by qualified technical
personnel.
Before commissioning the air-water heat pumps, make sure that:
• All the safety conditions have been met.
• The air-water heat pump has been opportunely secured to the bearing plane.
• The area of respect has been observed.
• The hydraulic connections has been carried out according to the instruction manual.
• The hydraulic system has been loaded and vented.
• The interception valves of the hydraulic circuit are open.
• If a boiler is present in the system, check that the non-return valves have been installed on the water
inlets to the heat pump and to the boiler to avoid reductions in water flow rate in the system and entrance
of too hot water in the heat pump.