Télécharger Imprimer la page

Olimpia splendid SHERPA AQUADUE TOWER S3 E Instructions Pour L'installation, L'emploi Et L'entretien page 84

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 106
SHERPA S3 E 4
SHERPA S3 E 6
SHERPA S3 E 8
SHERPA S3 E 10
SHERPA S3 12
SHERPA S3 14
SHERPA S3 16
SHERPA S3 12T
SHERPA S3 14T
SHERPA S3 16T
3.6.1 - Access to electrical connections
• Before carrying out any intervention, make sure that power supply of the
external and internal units are disconnected.
• These operations are only allowed for specialized personnel.
- To access the terminal boxes for the electrical connections of the internal unit, remove the electric panel
lid as described in its respective paragraph.
- To access the terminal blocks for electrical connections of the external unit, remove the panel of the
right side.
3.6.2 - Connection cables
The following table lists the cables which must be used.
UE/UI communication cable
A
DHW probe and external air
B
cable
Internal unit
C
Power cable
External unit
D
Power cable
External unit
External unit power
maximum absorbed
supply
V ~ ph
Hz
220-240 ~ 1
50
220-240 ~ 1
50
220-240 ~ 1
50
220-240 ~ 1
50
220-240 ~ 1
50
220-240 ~ 1
50
220-240 ~ 1
50
380-415 ~ 3
50
380-415 ~ 3
50
380-415 ~ 3
50
3 x 0,5 mm
S3 E 4
H07RN-F
3 G2,5
S3 12
H07RN-F
3 G6,0
External unit
maximum absorbed
power
current
kW
A
2.2
10.5
2.6
12.0
3.3
14.5
3.6
16.0
5.4
24.5
5.7
25.0
6.1
26.0
5.4
9.0
5.7
10.0
6.1
11.0
screened, suitable for data transmission (LiYCY
2
type or equivalent)
H03RN-F 2 G 0,5 / H03VV-F 2 G 0,5
SHERPA SMALL S3 E
3 X H07V-K 4 mm2
S3 E 6
H07RN-F
3 G2,5
S3 14
S3 16
S3 12T
H07RN-F
H07RN-F
H07RN-F
3 G6,0
3 G6,0
5 G2,5
SHERPA AQUADUE TOWER
Fuse or
magnetothermic
(MFA)
A
18
18
19
19
30
30
30
14
14
14
S3 E 8
S3 E 10
H07RN-F
H07RN-F
3 G2,5
3 G2,5
S3 14T
S3 16T
H07RN-F
H07RN-F
5 G2,5
5 G2,5
EN - 23

Publicité

loading

Ce manuel est également adapté pour:

Sherpa s3 e