Télécharger Imprimer la page

WAGNER HC 940 Mode D'emploi page 44

Groupe de projection à haute pression
Masquer les pouces Voir aussi pour HC 940:

Publicité

Les langues disponibles

Les langues disponibles

Starting operation
4.4 Gasoline engine (gas units only)
1. Fill in the supplied engine oil.
The gasoline engine is transported without engine oil.
The oil-level sensor prevents the engine from being
started when the oil level is too low.
For oil grades and quantities please refer to the en-
gine instructions.
2. Fill the gasoline tank.
For information on the gasoline please refer to the
engine instructions.
4.5 Connection to the mains (electric
units only)
The connection must take place
through a properly earthed two-pole
and earth socket outlet.
Attention
Before connecting the unit to the mains supply, make
sure that the line voltage matches the specifications on
the unit's rating plate.
The green indicator light will light up as soon as the
mains plug has been connected.
4.6 Cleaning preserving agent when
starting-up of operation initially
1. Push locking pin (fig. 14, item 1) and swivel material
feed pump to a container with suitable cleaning agent.
2. Turn the pressure control knob (2) on the hydraulic
pump to the left (pressure reduction) until it stops.
3. Turn the relief valve handle (3) fully counterclockwise
(k Circulation).
4. Start the engine or turn on the electric motor.
a. To start the gas engine, refer to the engine manual.
b. To start the electric motor:
For HC 920 and HC 940 units, move the switch
to "1" (ON).
For HC 960 units, first set the switch to "Y" and
then to "∆" (ON).
The direction of the rotation of the pulley
must correspond to the arrow (4) on the
belt cover. If the belt is running opposite
i
the direction of the arrow: Switch unit to
"O" (OFF). Unplug power plug and turn
the polarity changer (5) in the power plug
by 180º with a screwdriver. Plug in power
plug again.
5. Move the hydraulic ball valve (6) on the material feed
pump to its vertical position (open). This will switch on
the hydraulic motor.
Hydraulic oil flows to the hydraulic motor of the materi-
al feed pump.
6. Turn the pressure control knob (2) to the right (pres-
sure increase) until cleaning agent exits the return
hose.
42
GB
7. Turn relief valve handle (3) fully clockwise (p spray).
8. Pull the trigger of the spray gun.
9. Spray the cleaning agent from the unit into an open
collecting container.
6
HC960E
HC960E-SSP
4.7 Taking the unit into operation with
coating material
If the unit is located on a non-con-
ductive surface (e.g. a wood floor),
earth the unit with an earthing cable.
Danger
2. Push locking pin (fig. 14, item 1) and swivel material
feed pump into the coating material container.
3. Turn the pressure control knob (2) on the hydraulic
pump to the left (pressure reduction) until it stops.
4. Turn the relief valve handle (3) fully counterclockwise
(k Circulation).
5. Start the engine or turn on the electric motor.
a. To start the gas engine, refer to the engine manual.
b. To start the electric motor:
For HC 920 and HC 940 units, move the switch
to "1" (ON).
For HC 960 units, first set the switch to "Y" and
then to "∆" (ON).
4
2
3
1
5
HC 920 • HC 940 • HC 960

Publicité

loading

Ce manuel est également adapté pour:

Hc 920Hc 960Hc 940-sspHc 960-ssp