Power One AURORA PVI-3.8-I-OUTD Manuel D'utilisation Et D'installation page 37

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation and operating manual
(PVI-3.8/4.6-I-OUTD Rev.: 1.5)
Select the standard based on the following table:
LEFT
RIGHT
SELECTOR
SELECTOR
0
0
0
0
0
0
0
0
0
0
0
0
1
1
1
*
There are deviations from the standard VDE, according to the local norms in low.
** There are deviations from the standard AS47773, according to the local norms in low.
Once the standard has been chosen, a meter will begin to scan the connection to the
grid for 24 hours. Before 24 hours expire, the selected standard can still be changed.
Once the 24 hours have passed, the Power-One assistance center would have to send
an Authorization Key to unblock the inverter, and allow further changes. Remaining
time can be checked on the information menu
GRID STANDARD
0
1
DIN V VDE V 0126-1-1
Guida per le connessioni alla rete
5
elettrica di ENEL Distribuzione
6
El real decreto RD1663/2000
7
8
9
A
B
D
DIN V VDE V 0126-1-1*
E
DIN V VDE V 0126-1-1*
F
DIN V VDE V 0126-1-1*
0
DIN V VDE V 0126-1-1*
1
DIN V VDE V 0126-1-1*
6
DIN V VDE V 0126-1-1*
N.A.
UK G83/1
UK G59/2
EN50438
AS47773
AS47773**
Page 36 of 95
COUNTRY
LANGUAGE
N.A.
English
GERMANY
German
ITALY
SPAIN
Spanish
UNITED
English
KINGDOM
UNITED
English
KINGDOM
IRELAND
English
AUSTRALIA
English
ISRAEL
English
FRANCE
French
BENELUX
French
GREEK
English
PORTUGAL
English
CORSICA
French
CZECH REP.
Italian
Czech

Publicité

Table des Matières
loading

Table des Matières