Personnel Qualification; Intended Use - Kessel Aqualift S Basic Instructions De Pose Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29
2.2
Personnel - qualification
The relevant operational safety regulations and the haz-
ardous substances ordinance or national equivalents apply
for the operation of the system.
The operator of the system must:
prepare a risk assessment
identify and demarcate corresponding hazard zones,
carry out safety training,
secure the system against unauthorised use.
Person
1)
Operating company
Competent expert / inspec-
tor (familiar with, under-
stands operating instructions)
Competent skilled person (spe-
cialist craftsman, in accor-
dance with installation instruc-
tions and execution standards)
Qualified electrician (accord-
ing to national regula-
tions for electrical safety)
1) Operation and assembly work may only be carried out by persons who are at least 18 years of age.
2.3

Intended use

The system may only be used for pumping away domestic non-faecal wastewater; however, it must not be used for flamma-
ble or explosive liquids or solvents.
WARNING
Use of the system in a potentially explosive environment (ATEX) is not permitted.
The system is suitable for the disposal of wastewater below the backwater level and for installation in the ground. The sys-
tem is not suitable for installation in ground water.
Observe regional and local municipal regulations - maximum wastewater temperatures (e.g. 35°C) are often stipulated,
amongst other things.
All conversions or attachments that are carried out without the express and written permission of the manufacturer, the use
of non-genuine spare parts and repairs carried out by companies or persons not approved by the manufacturer will lead to a
loss of warranty.
016-232_01
Approved activities on KESSEL systems
Visual check
Emptying, cleaning
(inside), functional
check, configuration
of the control unit
Installation and operating instructions
Installation, replace-
ment, maintenance
of components,
commissioning
Work on electrical
installation, connec-
tion of the control unit
19 / 84

Publicité

Table des Matières
loading

Table des Matières