2
Safety
2.1
General safety notes
CAUTION
Risk of crushing. The system and system components are heavy and in some cases unwieldy.
Use suitable lifting gear when lifting or transporting. The system shall be moved only when properly secured on
pallets. A forklift truck must be used for transport.
Craning is only permitted in the case of systems equipped with a transport eye (optional special design).
Use transport equipment and personal protective equipment.
NOTICE
Hazardous atmosphere!
There is a risk of a hazardous atmosphere occurring in the chamber system during work.
Make sure the system is well aerated.
Use safety equipment such as e.g. a multi-gas warning device if necessary.
NOTICE
Contaminated surface!
The system and surroundings can be contaminated by germs.
Do not store or consume any food in the same room.
Avoid touching the surface, remove visible dirt.
After work is complete, wash your hands.
CAUTION
Note the structural calculations for traffic safety. Chamber installation for load class D makes a load distribution plate
made of reinforced concrete necessary (exception: not necessary for standard road construction).
Determine the required load class and structural calculations in accordance with the environment / use condi-
tions.
Request an appropriate reinforcement drawing from the KESSEL hotline.
2.2
Personnel - qualification
The relevant operational safety regulations and the hazardous substances ordinance or national equivalents apply for the
operation of the system.
The operator of the system must:
prepare a risk assessment
identify and demarcate corresponding hazard zones
carry out safety training
secure the system against unauthorised use.
Person
1)
Operating company
Competent expert / inspector (familiar
with, understands operating instructions)
Competent skilled person (specialist
craftsman, in accordance with installa-
tion instructions and execution standards)
1) Operation and assembly work may only be carried out by persons who are 18 years of age.
20 / 100
Approved activities on KESSEL systems
Visual inspection, inspection
Engineering chamber LW 1000 /
Installation and operating instructions
Emptying, cleaning
(inside), functional check
Installation, replacement,
maintenance of compo-
nents, commissioning
010-701