Mounting / Connecting The Gas Cylinder; Mounting The Welding Torch; Starting Up The Cooling Unit - Fronius VARIOSTAR 357 Mode D'emploi

Masquer les pouces Voir aussi pour VARIOSTAR 357:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig.17
Mounting the interconnecting cable
Mount the interconnecting cable to the wirefeeder
- Shift the mains switch
to the "O" position
- Remove the right housing-panel from the wirefeeder
- Pass the interconnecting cable through the lead-through in the housing
- Plug in the (16-pole) control plug of the interconnecting cable, the right
way round
- Screw the cable lug on the end of the 'plus' lead onto the bolt, using
the screw and washer provided
- Fronius type:
Connect the water forward-flow and return-flow hoses to the hoses of
the torch central connector, red-to-red and black-to-black
- Fronius F++ / Dinse / Euroconnector type:
- Remove the blind plastic covers from the lead-throughs
- Remove the plastic nuts from the couplings of the forward and return-
flow hoses
- Insert the couplings of the forward and return-flow hoses through the
housing lead-through
- Tighten the couplings of the forward and return-flow hoses with the
plastic nuts
- Screw the hex-nut of the gas hose onto the gas connector on the
wirefeeder and tighten
- Fit the housing panel back onto the wirefeeder
Fig.18
Mounting the interconnecting cable to the VR 57 / Fronius type
All manuals and user guides at all-guides.com
Fig.18b

MOUNTING / CONNECTING THE GAS CYLINDER

- Stand the cylinder on the bracket next to the cooling unit
- Fix the gas cylinder in place with the safety chain
N.B.! The cylinder is only fixed properly if the chain is placed around the
top part of the cylinder (but not around the neck of the cylinder)
- Take off the protective cap from the cylinder
- Give the cylinder valve a quick turn to the left so as to blow off any dirt
that may have accumulated
- Check the seal on the pressure regulator
- Attach the pressure regulator to the gas cylinder and tighten it
- Connect the gas hose from the machine to the pressure regulator

MOUNTING THE WELDING TORCH

- Shift the mains switch
- Check that the torch is correctly tooled up. Insert it - infeed tube first
- into the central torch connection socket
(wirefeeder)
- Fix by tightening the swivel nut by hand
- Plug the torch control plug into the torch control socket
it
- Connect up the welding torch hoses for water forward and return flow,
as per the colour markings, to plug-type connectors
source / wirefeeder (only on Dinse / Euroconnector versions)

STARTING UP THE COOLING UNIT

N.B.! Check the volume and quality of coolant water before starting to use
the unit.
- Shift the mains switch
- Remove the screw cap from the filler neck
- Top up with coolant (mixing ratio as per following table)
- Screw the cap back on again
N.B.! Only use clean tap water. The electrical conductivity of all other
antifreeze agents makes them unsuitable for use here.
12
Mounting the interconnecting cable to the VR 57 / Fronius F++, EC od. Dinse
to the "O" position
to the "O" position
Warning! As Fronius has no influence on factors such as the
quality, purity and filling-level of the coolant, no warranty is given
for the coolant pump.
on the power source
, and latch
on the power

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Variostar 357-2Variostar 457Variostar 457-2

Table des Matières