Télécharger Imprimer la page

CLAS PE 2008 Mode D'emploi page 87

Pont elevateur 2 colonnes 4t passage haut 3870mm 2.6kw

Publicité

Les langues disponibles

Les langues disponibles

PE 2008
PE 2003
TESTING OF LIFT OPERATIONS
1)
Load a vehicle on the lift and check:
2)
Correct hydraulic alignment at the maximum height.
3)
Correct lowering manoeuvre with safety lock release in the automatic mode (lift should go up
about 30-40mm before lowering).
4)
Correct engagement of the safety locks in the automatic mode.
5)
Correct operation of FCE: the automatic braking function is automatically cut off by the limit
switch.
HYDRAULIC SYSTEM TESTING
1)
Lift the vehicle of about 50 cm using the UP push-button and the AUTOMATIC BRAKING
CUT-OFF PUSH-BUTTON (yellow) to prevent lift positioning on the mechanical safety locks.
2)
Measure the carriages height at a specific point and write down the measured values.
3)
After about 15 minutes, check for the tightness of the connections and of the other hydraulic
parts.
4)
Measure the carriages height at the same point measured before and check with the starting
measured values: maximum shifting (lower) 1-2 mm.
WARNING: IN CASE OF DOUBT WAIT WITHOUT MOVING THE LIFT AND CHECK AGAIN.
IN CASE OF DOUBT CONTACT THE MANUFACTURER'S SERVICE DEPARTMENT.
PE 2009
87

Publicité

loading

Ce manuel est également adapté pour:

Pe 2003Pe 2009