Operational Checks; General; Siphon System; Water Float Valve Check - Manitowoc QM45 Instructions D'installation

Masquer les pouces Voir aussi pour QM45:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operation

Operational Checks

GENERAL

Your Manitowoc ice machine was factory-operated and
adjusted before shipment. Normally, a newly installed ice
machine does not require any adjustment.
To ensure proper operation, always follow these
Operational Checks when starting the ice machine:
for the first time
after a prolonged out of service period
after cleaning and sanitizing
Routine adjustments and maintenance procedures
outlined in this manual are not covered by the warranty.

SIPHON SYSTEM

To reduce mineral build-up and cleaning frequency, the
water in the sump trough must be purged during each
harvest cycle.
When the water pump de-energizes the level in the
water trough rises above the standpipe starting a siphon
action. The siphon action stops when the water level in
the sump trough drops. When the siphon action stops,
the float valve refills the water trough to the correct level.
Siphon System Check
Follow steps 1 through 6 under water level check.
WATER
LEVEL
10
SIPHON
CAP
STANDPIPE
DRAIN

WATER FLOAT VALVE CHECK

Before water will flow into the water trough the float
valve shut-off must be in the OPEN position.
PRESS TO
CLOSE
Section 3
PRESS TO
OPEN
Part Number 040001360 6/14

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Qm45a

Table des Matières