Important:
• The Stack option prevents a scheduled Program or manually
operated valve station from operating until any current opera-
tion has been completed or canceled. At midnight, any remaining
scheduled Programs stacked in queue will be canceled.
• Selecting the Overlap option can cause the electrical and/or
hydraulic capacity of your irrigation system to be exceeded.
Always plan your watering schedule carefully!
1 . Turn the Dial to the Skip Days - Special Functions position .
2 . Place the Function switch in the Set Programs position .
3 . Press the Manual button repeatedly to display 3:On (three
programs or stations can run concurrently) .
4 . To select the Stack option, press the
5 . Return the Dial to the Current Time position .
6 . Return the Function switch to the Run position .
Station Delay
Irrigation systems that utilize a well-water source or have slow-
closing valves, may require a delay period to occur between con-
secutive stations during a watering cycle . The Station Delay feature
enables a delay period to be set from 1 second to 2 hours .
1 . Place the Function switch in the Set Programs position .
2 . Place the Program switch to select A, B or C .
3 . Turn the Dial to the Skip Days - Special Functions position .
4 . Press the Manual button repeatedly to display W:00 (no delay) .
5 . Press the
01–59 minutes (MIN) or 1 .0–2 .0 hours (HR .) .
Note: Hold the button down to scroll. The display will continuously
scroll from seconds to minutes to hours (:00 = no delay time).
6 . Return the Dial to the Current Time position .
7 . Return the Function switch in the Run position .
/
buttons to set the delay time: 00–59 seconds,
/
button to choose 1:On .
29