Irritrol Rain Dial-R Guide De L'utilisateur page 13

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4 . Route the cable through the largest opening in the base of the
controller cabinet or through conduit if installed . Remove the
cable jacket to expose about 8" of wires . Carefully remove 3/8" of
insulation from the end of each wire to be connected .
5 . Secure each valve wire to numbered terminal in the preferred
operating sequence order .
6 . Connect the common wire to the terminal labeled "VC ."
7 . If applicable, connect one leg of the master valve or pump start
relay control wire to the terminal labeled "MV/PUMP", and the
remaining leg to the valve common wire .
Note: The controller does not supply power to operate a pump. The
pump start relay must have a nominal coil voltage of 24 VAC, rated
at 0.375A maximum.
Figure 4
Sprinkler
Control Valves
Valve Common Terminal
EARTH
7
GROUND
Master Valve/Pump Terminal
1
1
2
8
9
10 11 12
VC
+
2
3
4
5
6
MV/
Pump
Sensor
24V Relay
MV
Pump Start Relay
or Master Valve
3
Common Wire
24 VAC
-
11

Publicité

Table des Matières
loading

Table des Matières