MANUAL
Figure 10
Neutral or L1 to
White or Blue
Hot or L2 to
Black or Brown
Electrical Conduit
Controller Station Test Feature
The controller Station Test feature enables you to quickly check for
proper valve station operation after initial installation or service . The
test cycle enables all valve stations to operate in sequence for a
temporary run time, adjustable from 1–10 minutes .
1 . Place the Function switch in the Set Programs or Run position .
2 . Turn the Dial to the Skip Days - Special Functions position .
3 . Press the Manual button (one time) to select
the Test Run display as shown at right .
4 . A 2-minute test run time is set by default . To adjust the run time
from 1–10 minutes, press the
5 . Press the Semi-Auto button to start the watering cycle . Station 1
will turn on .
6 . Turn the Dial to the Current Time position . The display will
indicate the current clock time (initially 12:00 PM) and station 1 .
7 . To manually advance through the station operating sequence,
press the Manual button .
Conduit Body
Equipment Ground to
Green or Green/Yellow
or
button .
1 2 3 4 5 6 7 8 9 1 0 1 1 1 2
17