Setting the Program Cycle Start Time(s)
Each Program can have three separate start times . For mature
landscapes, one start time per Program is generally sufficient .
When establishing a new lawn, using two or three start times with
short valve run times can provide the additional irrigation required
for grow-in, at a reduced rate to help prevent runoff and erosion .
1 . Place the Function switch in the Set Programs position .
2 . Select Program A, B or C .
3 . Turn the Dial to select Start Time 1 (2 or 3) .
4 . Press the
Note: To remove a start time, select Off, displayed between
11:59–12:00 and 5:59–6:00 (AM and PM).
5 . Repeat steps 3 and 4 to set additional start times for this Program .
6 . Repeat steps 2–5 for each Program as needed .
7 . When finished, return the Dial to the Current Time position .
8 . Return the Function switch to the Run position .
Setting the Program Watering Day Schedule
Watering days can be scheduled for each Program using one of
the following methods:
• Weekdays - Schedules watering for specific days of the week .
• Skip Day - Schedules watering days by interval frequency;
e .g ., every day (01), every-other-day (02) etc .
• Odd/Even Date - Schedules watering days based on Odd- or
Even-numbered calender days .
To set a Weekdays Schedule:
1 . Place the Function switch in the Set Programs position .
2 . Select Program A, B or C .
3 . Turn the Dial to the desired weekday position .
4 . Press the
remove the day (Off) from the watering day schedule .
5 . Repeat steps 3 and 4 to schedule additional weekdays as needed .
6 . Repeat steps 2–5 for each Program as needed .
7 . When finished, return the Dial to the Current Time position .
8 . Return the Function switch to the Run position .
or
button to set the start time (note AM/PM) .
button to select the day (On), or the
button
23