Télécharger Imprimer la page

Repairs; Fuse Substitution; Checking Of The Equipment Before Each Use; Function And Safety Check And Test - Gima DIATERMO MB200 Mode D'emploi

Publicité

Les langues disponibles

Les langues disponibles

GIMA SpA

6.5 REPAIRS

High frequency cables and electrode holder handle cannot be repaired. Always substitute a damaged part with a new one.
6.5.1 F
S
USE
UBSTITUTION
Before substituting the fuse, disconnect the unit from the mains system.
Only use fuse of the kind 5x20; they must have those characteristics: 3.15AT (slow) (230V~ mains voltage), 6.3A (115V~
mains voltage), proceed as follows:
1-2 Extract, with a small screwdriver, the drawer under the mains socket
3 Extract the damaged fuse and insert two new ones
4 Reinsert the drawer

6.6 CHECKING OF THE EQUIPMENT BEFORE EACH USE

Each time the use of the electrosurgical equipment is planned a check of the most important safety aspects has to be
implemented considering at least the following:
Check the integrity of cords, connections, wires breakage, etc.
Assure that all the electrical equipment is properly grounded
Assure that all the accessories that should be used are available and sterilised.
Check, by disconnecting the reference electrode cable, the functioning of the OC light and sound alarm warning.
Check, by activating the CUT and COAG power switch, the functioning of the emission lights and sounds warnings.

6.7 FUNCTION AND SAFETY CHECK AND TEST

At least once a year, the biomedical engineering department or other qualified personnel should do the following check and test:
Check of the connectors and mains supply cord conditions;
Visual check of the mechanical protections;
Check of the protections against the danger due to liquid's pouring, dripping, moisture, liquid's penetration, cleanliness,
sterilization and disinfection.
Check of the Equipment's Datas on the Label
Check of the availability of the Instruction's Manual
Check the functioning of the H.F. output controls
Check the uniformity of the resistance through the surface of the patient plate.
Test the earth conductivity resistance.
Test the earth leakage current.
Test H.F. leakage current.
Control of the neuromuscular stimulation.
Control of the accuracy of the output power.
Manuale d'istruzioni / Instruction's Manual
MA182IGBb
DIATERMO MB200
35

Publicité

Chapitres

loading