Duct Mounting
Special Duct Mount Installation
This option works best for airflows between 500–4000 ft./min.
The E
Point must be duct mounted using the custom box provided with
3
the duct mount version. All of the components housed within the box are
factory assembled.
1
1. Select the location for the unit.
2. Measure and mark the holes for intake and exhaust tubes.
3. Drill the holes for the sampling tubes (making sure holes are
large enough for plug).
4. Affix intake and exhaust tubes to the mounting box.
5. Insert the tubes into the holes on the ducting.
Ensure to orient the air holes on the air intake tube to face the airflow.
6. Screw the mounting box onto the duct.
7. Remove the desired knock out (depending on where cables will
enter box) and affix appropriate conduit.
8. Run wiring through the conduit and duct mount box to the unit.
Connect wires according to the
9. Screw cover onto the E
mounting box.
E
Point Standalone Gas Monitor User Manual
3
2
Ductmount housing
Housing cover
Figure 2. Duct Mounting
4
3
Air flow
Air intake tube
Air exhaust tube
Wiring
Point and replace the cover on the
3
Installation
Details.
5