Installation Onto The Pipe - Burkert 8400 Manuel Utilisateur

Masquer les pouces Voir aussi pour 8400:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.2.

installation onto the pipe

danger
Risk of injury due to high pressure in the installation
Stop the circulation of fluid and depressurize the pipes before
loosening the process connections.
Risk of injury due to high fluid temperatures.
Use safety gloves to handle the device.
Stop the circulation of fluid and depressurize the pipes before
loosening the process connections.
Risk of injury due to the nature of the fluid.
Respect the regulations on accident prevention and safety relat-
ing to the use of aggressive fluids.
Choose a standard G 1/2", NPT 1/2" or Rc 1/2" connection
(depending on the port connection of your device) to install the
device onto the pipe.
Always ensure a watertight seal between the device and
the pipe by following the instructions below.
Install the connection on the pipe according to the installation
instructions provided with the connection.
For versions with G 1/2'' port con-
nection, ensure that the O-ring is in
place on the device.
Replace it if necessary.
Fig. 4:
Location of the O-ring on a version with G 1/2" port
connection
14
english
Type 8400
Installationandwiring
do not use its housing to screw the device onto the
pipe.
Using an appropriate tool, screw the device
into the connection.
Fig. 5:
Installation of the device on the connection
When repositioning the housing, do not unscrew the
metal part of the device from the pipe.
After positioning the housing, put the cover
back in its initial position.
ENTER
O
U
T
0....9
Fig. 6:
Final position of the housing cover

Publicité

Table des Matières
loading

Table des Matières