To avoid scratching the product with the hexagonal
wrench, align the groove on the body of the product
with the screw before screwing it in (Fig. 28, page
28).
Fig. 28
Fasten the upper unit to the base using the 3 fixing
screws.
Pay attention to the fixing. Tightening
torque: 4.5Nm (±0.2Nm).
Apply thread-locker into the holes for
screws (Loctite 222®).
Fig. 29
28
7 Switching on
Ensure the unit and the other components
of the system are appropriately closed to
prevent contact with live parts.
Make sure that all parts are fastened down
firmly and safely.
The automatic pre-heating (De-Ice)
process could be started whenever the
device is switched on and the ambient
temperature is below 0°C (+32°F). The
procedure is necessary to guarantee
correct operation of the devices even at
low temperatures. The duration ranges
depending on environmental conditions
(from 60 minutes up to 120 minutes).
The unit is switched on by connecting the power
supply.
To switch off the unit disconnect the power.
MNVCEVO_2203_EN