Operator Installation - Erreka ARES Manuel De L'installateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5

OPERATOR INSTALLATION

Assembly positions and levels
Levels A and B determine the opening angle C.
Short operator (run 300mm), inward opening
Long operator (run 400mm), inward opening
Short operator (run 300mm), outward opening
Long operator (run 400mm), outward opening
INSTALLATION
A (cm) B (cm)
C (º)
140
140
95
120
160
120
A (cm) B (cm)
C (º)
190
190
95
135
185
120
A (cm) B (cm)
C (º)
140
140
95
120
160
120
A (cm) B (cm)
C (º)
190
190
95
135
185
120
ARES electro-mechanical operator
31

Publicité

Table des Matières
loading

Table des Matières