INSTALLING THE MOUNTING BRACKET
WARNING
:
WHEN CUTTING OR DRILLING INTO CEILING, DO NOT DAMAGE ELECTRICAL WIRING AND OTHER HIDDEN UTILITIES. WHEN
BUILDING FRAMEWORK, ALWAYS FOLLOW ALL APPLICABLE CONSTRUCTION CODES AND STANDARDS.
To construct wood wall framing that is flush with surface of ceiling studs, ensure that:
a) The framing is centered over installation location and is sturdy enough to support the
weight of the hood.
b) The height of the framing will allow the mounting bracket to be secured to the framing
within the dimensions shown.
After wall surface is finished, carefully center and level the hood mounting bracket, secure it to wall
framing with 3 No. 8 x 1½" mounting screws. Tighten the screws completely.
INSTALLING THE MOUNTING BRACKET (
IMPORTANT: Make sure that holes locations are leveled and correctly centered by the vertical centerline
(this installation instruction applies for concrete wall).
WARNING: AT LEAST TWO PEOPLE ARE REQUIRED TO LIFT AND POSITION THE HOOD ONTO THE MOUNTING
SCREWS.
WARNING: BE CAREFUL WHEN INSTALLING THE DECORATIVE CHIMNEY AND HOOD, THEY MAY HAVE SHARP
EDGES.
CAUTION: DO NOT REMOVE THE PROTECTIVE PLASTIC FILM COVERING THE DECORATIVE CHIMNEY AT THIS
STAGE.
INSTALLING THE UNIT
Secure the hood to the recommended height of 26 "above the electrical cooking surface and 30" above the gas
cooking surface.
Refer to the tools list to proceed with installation
)
continued
Adjust the brackets to the desired height
Install the duct on the air outlet
23