To carry out this operation, proceed as follows.
1 - Turn off the gas supply tap.
2 - Pull off the knob (A).
3 - Undo the screws (C) and remove the control
panel (B).
4 - Remove the injector (D) and replace it with the
one suitable for the type of gas in use (see table
at back of manual).
5 - Fully screw the injector.
6 - After making the setting, seal the screw with
paint.
7 - Replace the control panel (B) and the knobs (A)
on completion of the operation.
ADJUSTING TOP BURNER PRIMARY AIR (4 KW)
To carry out this operation, proceed as follows.
1 - Turn off the gas supply tap.
2 - Pull off the knob (A).
3 - Undo the screws (C) and remove the con-
trol panel (B).
4 - Remove the screw (D).
5 - Set the burner mount (E) at a distance of
17 mm, and tighten the screw (D).
6 - Replace the control panel (B) and the knobs (A)
on completion of the operation.
IT
GB
DE
ADJUSTING TOP BURNER PRIMARY AIR (7 KW)
To carry out this operation, proceed as follows.
FR
1 - Turn off the gas supply tap.
2 - Pull off the knob (A).
ES
3 - Undo the screws (C) and remove the control
panel (B).
4 - Remove the screw (D).
5 - Set the burner mount (E) at a distance of 20
mm, and tighten the screw (D).
6 - Replace the control panel (B) and the knobs (A)
on completion of the operation.
English
C
A C
B
C
A C
B
C
A C
B
- 22 -
D
IDM-39614601800.tif
E
D
IDM-39614602000.tif
E
D
IDM-39616601400.tif